Taurus T60 (5.67MW)
6 New Taurus T60 Available
CAT XQ2000/3516B
40 New 2011 Units Available
Rolls Royce Trent 60 WLE
4 New 2011 Units Available
Click HERE to View How a Combined Cycle Power Plant Process Works
|
|
GE Frame 9E The GE MS9001E was introduced in 1970 to meet the growing need for 50 Hz gas turbine industrial and utility units with capability to burn a broad spectrum of fuels. It was the worldʼs first gas turbine larger than 100MW. The MS9001E has been uprated and improved using information accumulated from thousands of operating hours across the product line. Click here to view technical information |
||||||||
|
|
Solar Titan 130 Was introduced in 1997 and has sold more than 340 Units and over 3.7 millions operating hours. Solar Titan 130 philosophies include concurrent product development processes, continuous product evolution, proven design tools and procedures, extensive field testing in parallel with production introduction, and meets industrial, environmental, health and safety requirements which minimizes first-cost and life-cycle costs. Click here to view technical information |
||||||||
|
|
Caterpillar CAT C-32 Wide range of rugged features, system attachments, and factory designed, selected and tested at 50 and 60 Hz. Fully Prototype Tested with certified torsional vibration analysis and actual noise measurements available. The prototype test report is certified by the German TUV, an independent certification agency. CSC certification is provided for convenient transport and stackable storage of the module. Click here to view technical information |
||||||||
![]() |
FT8 MOBILEPAC Pratt & Whitney Power Systems' newest product, the FT8 MOBILEPAC, is a self-contained, gas turbine powered electric generating unit using PWPS' efficient FT8 gas turbine. This new mobile package consists of two primary units - the power trailer and the control trailer. The power trailer contains the gas turbine and the electric generator, while the control trailer houses the electrical control unit. Compared to the three week installation of the FT8 SWIFTPAC®, the MOBILEPAC can be on the grid and operating in less than one day (site ready). |
||||||||
![]() |
GE TM2500 Quickly Installed Mobile Power The TM2500 Mobile Power Unit is a perfect fit for temporary power applications including Base load bridge to a permanent power installation/maintenance, Peak shaving and Emergency or back up power. The TM2500 is GE's proven LM2500 gas turbine mounted on wheels… literally, a power plant contained on a mobile, four-trailer assembly. After minimal site and/or foundation preparation, it can reach full power within as few as three days from arrival on site and has less than a ten-minute start cycle to full power. The units are extremely flexible and have been transported via land, sea, and air to some of the most remote places in the world by an extremely experienced project management team. Click here to view technical information |
||||||||
![]() |
GE TM2500+ PLUS Click here to view technical information on the TM2500 Plus |
||||||||
![]() |
MTU 12V4000G61 Diesel Generators Click here to view technical information on the MTU Diesel |
||||||||
|
Gas Turbine Taurus T60 (T60-7901) Click here to view technical information on the Taurus T60 |
||||||||
|
|
Caterpillar XQ2000/3516B
Click here to view technical information on the 3516B
|
||||||||
| Rolls Royce Trent 60 WLE Click here to view technical information on the Trent 60 |
|||||||||
![]() Click image to view Specs |
Solar Turbines Solar offers factory packaged gas turbine-driven generation sets from 1.1 - 22.4 MW, with 50Hz or 60Hz application Natural Gas or Dual Fuel. The sets have three-phase generators, meet or exceed numerous European and North American standards, and can be equipped to operate in harsh environments. Solar turbine generator sets can be applied in combined-cycle systems or the turbine exhaust heat can be recovered for processes requiring thermal energy. Solar Turbine Models:
Click here to view technical information on the Taurus 60 Click here to view technical information on the Titan 130 Delivery time for any of those turbines 4 new units every 4 months from initial deposit. |
||||||||